PLAN ROOM:    SEEKING SUBCONTRACTOR PRICING FOR PROJECTS LISTED.

We send project bid invitations from PROCORE, our web-based project management software. If you would like to receive bid invitations from us, email your contact info to: bids@entelen.com and we'll send you a Procore invite (app.procore.com) so you can get an account setup and receive those invitations.

We keep our website up to date as well and you can access everything here.

Holiday Inn Express Renovations - Bountiful

 

:
:
:
:

Project Location:  999 North 500 West, Bountiful, Utah  84010 

 

Bid Date/Time:     December 03 @ 2 PM  Addendum 1 & 2                       

 

Submit bids and RFI's to:

Chris Nowell, Chris@entelen.com or bids@entelen.com

 

The scope of work consists of Renovations and Upgrades to current Building.

 

The trades involved in this project are Selective Demo, Metal Fabrications, Wood Framing, Rough-Finish Carpentry, Architectural Woodwork, EIFS-Stucco Repair, Membrane Roofing, Roof Accessories, Windows-Glazing, Metal Studs & Drywall, Tile, Carpet, Flooring And Base, Acoustic Tile, Painting, Specialties, Signage, Fire Sprinklers, Plumbing, HVAC, Electrical

 

Tooele Valley Mosquito Abatement District  Vehicle Storage Building

 

:
:
:
:

Project Location: 1548 Sunset Lane, Tooele, Utah  84074

 

Bid Date/Time: December 08, 2021 @ 4 PM 

 

Because this is a Morning bid on the 9th we need Sub bids the day before.                         

 

Submit bids and RFI's to:

Chris Nowell, Chris@entelen.com or bids@entelen.com

 

Project is TAX EXEMPT

 

Phase 1 -Work to Include:                                                                                                                                   1a. Demolition of existing Asphalt, Utilities, Concrete Curb/Gutter, Fences, Landscaping, etc. as shown on plans.  Field verify exact locations.                                                                                                                    1b. Construction of New Vehicle Storage Building, Asphalt, Utilities, Concrete Curb/Gutter, Fences, Landscaping, etc. as shown on plans.
1c. Construction of new pump room, building, utilities, concrete slab etc., as shown on plans.
1d. Construction of new Asphalt Drive approach with connection to Sage Lane, Concrete Curb/Gutter, Fences, Gates, Landscaping, Etc.,

1E. Existing Vehicle Storage Building, Asphalt, access paths, utilities, fences, etc., are to remain in operation during Phase I Construction.  Protect During Construction.

 

Phase 2 - Work to Include:                                                                                                                                  2a. Demolition of existing vehicle storage building, asphalt, utilities, concrete curb/gutter, fences, landscaping, paint, striping, etc. As shown on plans.  Field verify exact locations.                                            2b. Construction of new concrete wall w/ wash wands, Asphalt, utilities, concrete curb/gutter, fences, gate, irrigation, landscaping, new concrete waterway, etc. as shown on plans.                                                          2c.  Construction of new paint striping as shown on plans.                                                                                2d. New Vehicle Storage Building, Asphalt Access Paths, Utilities, Fences, Etc. are to remain in operation during Phase

2e. Construction.  Protect during construction.

 

The trades involved in this project are Selective Demolition, Excavation, Utilities, Asphalt Paving, Landscaping & Irrigation, Fencing, Rebar, Concrete & Concrete Sealing, Masonry, Structural Steel Framing, Metal Fabrications, Rough Carpentry, Wood Framing - Wood Trusses, Bituminous Damp proofing, Fluid Applied Waterproofing, Building Insulation, Blown Insulation, Metal Roof, Soffit & fascia Panels, Sheet Metal Flashing & Trim, Joint Sealants, Hollow Metal doors & frames, Access Doors & Panels, Sectional Overhead Doors, Door Hardware, Mirrors, Gypsum Board Assemblies, Resilient Base, Interior Painting, Traffic Signage, fire Protection Specialties, Shop Equipment, HVAC, Electrical, Communication Structured Cabling Systems, Electronic Safety - Instrusion Detection system, Security Systems, IP Video Surveillance System.

 

The construction schedule is as Follows.

1. Base Bid: Construction phasing as shown on sheet G103.
a. Substantial completion date of July 31, 2022
b. Liquidated Damages  $1000.00 per calendar day
2. Alternate: No construction phasing, with demolition of existing building & new
construction to occur as needed by the contractor (& coordinated with the owner).
a. Substantial completion date of June 30, 2022
b. Liquidated Damages $1000.00 per calendar day

Project Template

 

:
:
:
:

Project Location:  

 

Bid Date/Time:                             

 

Submit bids and RFI's to:

Chris Nowell, Chris@entelen.com or bids@entelen.com

 

Project Description/Base Bid: 
 

The trades involved in this project are 

 

Project to be completed by